1 / 5
This multi-story steel structure building showcases a prefabricated system ideal for commercial, office, and hospitality settings like office towers and hotels. It employs a robust hot-rolled or welded steel frame as the main load-bearing structure, ensuring high strength, flexible design, and faster construction.
| Component | Material and Specification | Key Feature |
|---|---|---|
| Main Frame | Columns/Beams: Q355B or Q235B H-section steel; High-strength bolted/welded joints | High load-bearing capacity, ductility, seismic resistance |
| Floor System | Steeldeck sheet with concrete slab; Secondary beams: C/Z purlins | Rapid installation, integrated utilities, vibration control |
| Roof & Wall Cladding | Insulated sandwich panels (PU/rock wool) or precast concrete | Thermal insulation, acoustic performance |
| Fire-protection | Spray-applied fire-resistant coatings (intumescent paint) | Meets fire resistance ratings (1–2 hours) |
| Corrosion Protection | Hot-dip galvanizing or epoxy priming | Long-term durability in humid environments |
Working Site
Loading Site
Finished Show
Standard Warranty: 12 months or 2,000 operating hours.
Extended Warranty: Optional coverage for up to 36 months.
Global Support: Technical installation guidance and worker assistance available worldwide.