Heavy-Duty Steel Structure Storage Solution for Efficient Inventory Management

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information

Usage:Food, Chemical, Heavy Industry, Warehouse
Life Span:50 Years
Building Codes:AISC, CE, GB
Steel Grade:A572 G50, Q355, JR355
Production Time:4-5 Weeks
Capacity:300,000 MT/Year
Steel Consumption:30-50kg per sqm
Dimension:Tailor-Made

Product Description

Steel Structure Storage Solution
Technical Specifications
Primary ComponentsHot-rolled H columns and I beams
Secondary ComponentsPurlins and bracings
Roof & Wall PanelSandwich Panel or Corrugated Single-Wall Panel
Tie RodSteel Rod
BraceSteel Pipe
Knee BraceAngle Steel
Roof GutterSteel Sheet

Key Benefits & Features

  • Expansive Spans without intermediate supports
  • Exceptional Strength and heavy load capacity
  • Cost-Efficiency in construction and maintenance
  • Effective Thermal and Energy Conservation
  • Rapid Assembly and straightforward assembly
  • Longevity extending beyond 50 years
  • Excellent Seismic Resilience
  • Sustainable and environmental responsibility
Steel Structure Overview
Portal Frame

Steel Portal Frame Structure

Economical | Extensive spans | Simple assembly. Perfect for low-rise or single-story structures with wide spans, offering large, open floor plans.

Steel Building Frame Structure

Adaptable structure layout. Frequently utilized in office buildings, educational facilities, and buildings with numerous units.

Frame Structure
Truss Structure

Steel Truss Structure

Facilitates larger spans. Widely used in bridges, TV towers, and roofs spanning large distances.

Steel Grid Structure

Partial structure | Three-dimensional design. Ideal for stadiums, transportation hubs, and terminals.

Grid Structure

Our Projects & Expertise

Project Showcase

With over 28 years of experience, our enterprise integrates design, fabrication, and erection services globally. We hold key certifications including AISC, CE (EN1090), and ISO 9001, ensuring international quality standards for every project.

Factory Overview
Facility
Production Line
Fabrication
Quality Control

Packaging & Shipping

We utilize standard ocean containers (20' / 40' / 40HC) with meticulous protection for all components.

  • Meticulous Protection for Steel Weld Components
  • Efficient Palletization and Loading
  • Safe Transport of Sandwich Panels
  • Comprehensive Loading Plans
  • Shipping Protection

    Frequently Asked Questions

    Are you a manufacturer or a trading company?
    We are a leading manufacturing factory. We welcome clients to visit us for comprehensive inspections to see our quality-controlled processes and professional excellence firsthand.
    How do you control product quality?
    We follow a stringent QC process, inspecting raw materials through to final assembly. We also support third-party testing from organizations like SGS and BV to ensure all industry benchmarks are met.
    Do you provide tailored design services?
    Yes! Our design team, featuring over 80 experienced engineers, creates customized solution drawings based on your specific project requirements, seismic conditions, and local loads.
    What is the expected lifespan of your steel buildings?
    Our steel structures are engineered for durability and are designed to have a functional lifespan extending beyond 50 years with proper maintenance.
    What support is offered if problems occur during installation?
    We provide detailed installation drawings and videos. For complex projects, we can provide onsite supervision, technical training, or a professional construction team to assist with the erection.
    What is the typical production and delivery timeline?
    Standard production time is typically 4 to 5 weeks. Final delivery depends on the project scale and shipping destination, but we provide comprehensive loading and unloading plans to ensure efficiency.

    Related Products