1 / 5
| Type | Slab Formwork for Concrete Construction |
|---|---|
| Material | Aluminium 6061-T6 or Steel Q235/Q345 |
| Surface Treatment | Hot dipped Galv or as specialized |
| Color | Green or Orange |
| Certification | National patent certificate ISO9001:2008 STANDARD |
| MOQ | 500M2 |
| Packing | Panels: in bundles, always 6-7 pcs per bundle; Props and frames: in steel frame pallet, 50pcs/pallet |
We do scaffolding and formwork shoring business more than 20 years, we exported to almost all of the world.
Main Characteristics:
Being a highly efficient formwork system, Green formwork requires only a small erection team of 3 to 4 workers. The average erection or dismantling production speed per man-day is between 75 to 100m². The built-in timber surface of Green formwork are made to last 50 to 100 use-cycles.
We have provided hundreds of formwork solutions to our customers around the world, and have achieved significant cost savings for our customers.
If you want to solve the construction cost and improve the construction efficiency, please contact us for the best building formwork solution.