GF Concrete Construction Wall and Panel Slab Column Solution-Reusable Metal Steel Frame Modular Precast Shuttering Formwork System for Sale

Customization: Available
After-sales Service: Construction Scheme
Warranty: Construction Scheme

Product Description

i

Basic Specifications

Certification
ISO, Patent
Material
Steel
Type
Slab Formwork
Frame Material
Steel / Aluminium
Accessories
Panel Prop
Panel Materials
Bamboo Plywood, Wood Plywood
Brand
Green Formwork
Capacity
400 Tons Per Month
★

Product Description

Modular Precast Shuttering Formwork System
Feature Technical Detail
TypeSlab Formwork for Concrete Construction
MaterialAluminium 6061-T6 or Steel Q235/Q345
Surface TreatmentHot dipped Galv or as specialized
ColorGreen or Orange
CertificationNational patent certificate ISO9001:2008 STANDARD
MOQ500M2
PackingPanels: in bundles (6-7 pcs); Props/Frames: in steel frame pallet (50pcs)
Formwork Solution Detail

With over 20 years of experience in scaffolding and formwork shoring, we have established a global presence across America, Australia, Sweden, Burma, Thailand, Cambodia, France, Dubai, and Germany.

Key Characteristics:

  • Great Safety Features: Built for maximum protection on site.
  • High Efficiency: Optimized for rapid productivity.
  • Green Construction: Environmental friendly reusable materials.
Erection Process System Components

Being a highly efficient formwork system, it requires only a small erection team of 3 to 4 workers. The average erection or dismantling production speed per man-day is between 75 to 100m2. The built-in timber surfaces are made to last 50 to 100 use-cycles.

Project Site 1 Project Site 2 Project Site 3 Project Site 4 Project Site 5 Project Site 6 Project Site 7

If you want to reduce construction costs and improve efficiency, we provide the best building formwork solutions.

?

Frequently Asked Questions

What materials are used for the Green Formwork frames?
The frames are constructed using high-quality Aluminium 6061-T6 or Steel Q235/Q345, providing a balance of strength and durability.
How many workers are required for the erection process?
This system is designed for high efficiency and only requires a small team of 3 to 4 workers for erection and dismantling.
What is the expected lifespan of the formwork panels?
The built-in timber surfaces of the Green formwork are engineered to last between 50 to 100 use-cycles, depending on maintenance and handling.
What is the average installation speed per day?
A typical team can achieve an average erection or dismantling speed of 75 to 100m2 per man-day.
Does the system meet international quality standards?
Yes, the system is certified under ISO9001:2008 standards and holds multiple national patent certificates.
What surface treatments are applied to the steel components?
Steel components are typically Hot Dipped Galvanized to ensure long-term corrosion resistance in harsh construction environments.

Related Products