1 / 5
| Feature | Technical Detail |
|---|---|
| Type | Slab Formwork for Concrete Construction |
| Material | Aluminium 6061-T6 or Steel Q235/Q345 |
| Surface Treatment | Hot dipped Galv or as specialized |
| Color | Green or Orange |
| Certification | National patent certificate ISO9001:2008 STANDARD |
| MOQ | 500M2 |
| Packing | Panels: in bundles (6-7 pcs); Props/Frames: in steel frame pallet (50pcs) |
With over 20 years of experience in scaffolding and formwork shoring, we have established a global presence across America, Australia, Sweden, Burma, Thailand, Cambodia, France, Dubai, and Germany.
Being a highly efficient formwork system, it requires only a small erection team of 3 to 4 workers. The average erection or dismantling production speed per man-day is between 75 to 100m2. The built-in timber surfaces are made to last 50 to 100 use-cycles.
If you want to reduce construction costs and improve efficiency, we provide the best building formwork solutions.