GF Concrete Construction Wall and Panel Slab Column Solution-Reusable Metal Steel Frame Modular Precast Shuttering Formwork System for Sale

Customization: Available
After-sales Service: Construction Scheme
Warranty: Construction Scheme

Product Description

i

Basic Specifications

Certification
ISO, Patent
Material
Steel
Type
Slab Formwork
Frame Material
Steel / Aluminium
Accessories
Panel Prop
Panel Materials
Bamboo Plywood, Wood Plywood
Brand
Green Formwork
Capacity
400 Tons Per Month

Product Description

Modular Precast Shuttering Formwork System
Feature Technical Detail
TypeSlab Formwork for Concrete Construction
MaterialAluminium 6061-T6 or Steel Q235/Q345
Surface TreatmentHot dipped Galv or as specialized
ColorGreen or Orange
CertificationNational patent certificate ISO9001:2008 STANDARD
MOQ500M2
PackingPanels: in bundles (6-7 pcs); Props/Frames: in steel frame pallet (50pcs)
Formwork Solution Detail

With over 20 years of experience in scaffolding and formwork shoring, we have established a global presence across America, Australia, Sweden, Burma, Thailand, Cambodia, France, Dubai, and Germany.

Key Characteristics:

  • Great Safety Features: Built for maximum protection on site.
  • High Efficiency: Optimized for rapid productivity.
  • Green Construction: Environmental friendly reusable materials.
Erection Process System Components

Being a highly efficient formwork system, it requires only a small erection team of 3 to 4 workers. The average erection or dismantling production speed per man-day is between 75 to 100m2. The built-in timber surfaces are made to last 50 to 100 use-cycles.

Project Site 1 Project Site 2 Project Site 3 Project Site 4 Project Site 5 Project Site 6 Project Site 7

If you want to reduce construction costs and improve efficiency, we provide the best building formwork solutions.

?

Frequently Asked Questions

What materials are used for the Green Formwork frames?
The frames are constructed using high-quality Aluminium 6061-T6 or Steel Q235/Q345, providing a balance of strength and durability.
How many workers are required for the erection process?
This system is designed for high efficiency and only requires a small team of 3 to 4 workers for erection and dismantling.
What is the expected lifespan of the formwork panels?
The built-in timber surfaces of the Green formwork are engineered to last between 50 to 100 use-cycles, depending on maintenance and handling.
What is the average installation speed per day?
A typical team can achieve an average erection or dismantling speed of 75 to 100m2 per man-day.
Does the system meet international quality standards?
Yes, the system is certified under ISO9001:2008 standards and holds multiple national patent certificates.
What surface treatments are applied to the steel components?
Steel components are typically Hot Dipped Galvanized to ensure long-term corrosion resistance in harsh construction environments.

Related Products